Review useful views
We consider entrances, approaches, side yards, gates, garages, patios, and other areas based on the home's layout.
Clean security infrastructure
Prepare useful viewpoints, entrances, and cable routes before stucco, insulation, and drywall make clean installation harder.
The practical advantage
We consider entrances, approaches, side yards, gates, garages, patios, and other areas based on the home's layout.
Cable is placed while framing is open so later equipment can be installed without exposed wiring or avoidable surface work.
Appropriate low-voltage routes can support network cameras, video doorbells, and related entry locations without selecting every device now.
Locations, routes, labels, tests, and concealed-condition photos are included in the PSH Prewire Record.
Plan before drywall
Start early
A free 15-minute Fit Call is the fastest way to review timing, priorities, and whether PSH planning fits your project.
Schedule a Free Fit Callor call (801) 440-7796